Warning: mysql_fetch_array(): supplied argument is not a valid MySQL result resource in /www/wwwroot/shznhg1/en/includes/db.inc.php on line 86

Warning: mysql_fetch_array(): supplied argument is not a valid MySQL result resource in /www/wwwroot/shznhg1/en/includes/db.inc.php on line 86
Hot pressing adhesive construction process-Shanghai Zhen Niu Chemical Co., Ltd.
01

Though it can't be reached, 

it will always go forward.


021-69769576
图片
News classification
当前位置
新闻翻页
文章正文
Hot pressing adhesive construction process
Time:2019-07-02 13:13:42    Page view (1006)

Hot pressing adhesive construction process



Hot pressing adhesive construction process:

                     1. The bonding surface must be kept flat, especially the wooden door.

                     2. The water content of wood moisture must be controlled at 12%, and the moisture content exceeding 15% will seriously affect the drying time and strength.

                     3. Repeated pressurization of the press during the production process will result in failure of bonding and debonding and cracking.

                      4, hand-applied veneer is recommended to apply two times of glue, and ensure that the glue is not completely dry under the ironing, reducing the phenomenon of veneer foaming.

                      5, the use temperature is above 5 °C

Shanghai Zhenniu Chemical Co., Ltd.

Down:www.shznhg.com (0)
图片
Telephone: 4008388936
Mobile phone: 18121234576
Fax: 021-69769576
Mailbox: zhenniu666@shznhg.com
Address: heavy Guzhen Industrial Park, Qingpu District, Shanghai
Technical support:上海真牛
上海真牛化工

      You can share it 

        with WeChat.

Online
Service

Online Serviceservice time:9:00-24:00

Select customer service online communication:

Hotl
ine

4008388936
24 hours customer service hotline

关注
微信

关注官方微信